Residential Service
Custom Decks in Bakersfield & Paso Robles
Pressure-treated wood, composite, or premium hardwood. Pergolas, railings, integrated lighting. Decks built to outlast the trend.
Tiers
Good · Better · Best
Good
- Pressure-treated wood
- Standard rails
- Simple footings
- 3–4 steps
Better
- Composite decking
- Upgraded rails
- Hidden fasteners
- Pergola option
Best
- Hardwood or premium composite
- Cable/glass rails
- Integrated LED lighting
- Custom pergola
The Process
What to Expect
A deck is a structural project first and a finish project second. Footings, ledger connections, joist spans, and rail loads all follow code, and when they don't, decks fail. Every Allied deck starts with engineered plans matched to your soil, span, and load conditions.
Material choice is the biggest cost driver. Pressure-treated pine is the value option and looks great when stained. Composite (Trex, TimberTech) is more durable and lower-maintenance. Hardwoods like ipe are premium, beautiful, dense, and long-lived.
Most Allied decks are complete in 1 to 3 weeks depending on complexity. Pergolas, cable railings, and lighting add time but transform how a deck feels day and night.
FAQ
Common questions
Ready to price your decks?
Free estimator. Real numbers. Takes 3–5 minutes.